Calculated fields

Idea created by Larry Johnston on May 25, 2016
    Long term plan
    Score15
    • 7054437
    • Amira Kane
    • Larry Johnston

    (Originally posted on 20, January 2016)

    Would it be possible to add the capability of calculated fields based off other fields. For example if we wanted to add a labor cost total to a report or an incident and have it calculate based off of the time on the incident, that would be fantastic!

    What problem will this feature solve?: